      Home Solutions Case Study Phase II 50MW Photovoltaic Power Plant Project in Ganzi, Sichuan

      Phase II 50MW Photovoltaic Power Plant Project in Ganzi, Sichuan

      Product type:  HAST, Tracker Mount

      Project size:  50 MW

      Project Type: Plateau Power Station

      Project Description:  The project is located in an area of high altitude, low temperature, high sunshine hours and complex terrain. It adopts medium and small linkage.

      The project is located in Dinggong Prairie, Zhengdou Town, Xiangcheng County, Ganzi Tibetan Autonomous Prefecture, Sichuan Province. The altitude of the site is about 4100m, and the solar energy resources are abundant. The project uses 280wp monocrystalline silicon components, string inverter, and horizontal single axis tracking system. The mounts are single-row steel columns with steel-filled piles, requiring small amount of civil construction, which generates the lowest eco-impact on the plateau. After the completion of the project, the amount of power generation has been well received by the owners.